The project consists in the construction of onshore LNG facilities and associated marine facilities in Orlovka bay, close to Teriberka, some 85km North-East of Murmansk.
Marine facilities for the Shtokman project consist of:

  • three jetties suitable for LNG/condensate carriers of 50,000 to 215,000 m3
  • a harbour basin dredged to DB -18 m
  • a Marine Offloading Facility (MOF) with a basin dredged to BD -9 m
  • a breakwater in water depths up to 50 m, with soft clay down to BD -85 m.
The remoteness of the area, the unprecedented size of the breakwater and the limited time frame for execution are typical aspects of this project.
BPA assessed the dredging and backfilling works being part of the project scope. This includes assessments and recommendations on various aspects like:
  • state-of-the art technologies and dredger capabilities
  • working methods and planning
  • possible constraints from environmental clearance procedures
  • production and cost estimate for the works
  • additional soil investigation
  • hydrographic survey challenges
  • winter operations
  • interaction of dredging with rock fill works
  • particular conditions for the D&C contract